Project Highlights
  • Implementation of new live energy monitoring system to capture power consumption characteristics and help identify areas where efficiencies can be deployed;
  • Implementation of cold aisle containment in comms rooms. The increased efficiency brought on by the cold aisle containment was sufficient to render half the CRAH units on site redundant;
  • Proposal to replace aged light fittings with new high efficiency LED system (ROI of 5 years);
  • Redistribution of building loads to bring the building back within the allocated power limits.

The ABC Headquarters at Ultimo was constructed in 1989, with a 13-storey office tower added in 2002. The building was occupied by approximately 3,000 ABC staff and was home to several radio stations and their flagship TV content – News24 and Q&A.

The key infrastructure consisted of:

  • 2 x 1500 kVA backup generators;
  • Several small UPS modules for localised communications rooms;
  • Air handling units & associated air-cooled chillers;
  • 3 x 11kV feeders, 2 x 1.5MVA transformers and 1 x 2MVA transformer;
  • VESDA Fire Detection.

Senior Project Manager, Brendan Smith’s roles were the overhaul of the UPS system, which involved the replacement of the existing UPS systems with a single, consolidated N+1 configuration that would support critical loads in the building.

Towards the end of the project, he completed a high-level audit of existing infrastructure and identified two high risk elements. One – the building had exceeded the nominal supply rating of two HV feeders. Two – cooling capacity at site had been reached.

Our Clients

Testimonials

Regional Project Director

David Guth

Following the highly successful launch of Stage 1 of Global Switch Sydney East, we chose to extend our relationship with AREA3 from Stage 1 into Stages 2 and 3 due to their professionalism, knowledge of mission-critical infrastructure projects, and the high quality of their work

Critical Services Manager

Barry Robertson

Your diligence throughout the project concept, design and construction is what helped the actual install go as smoothly as it did. You have all been a fantastic team to work with and we look forward to continuing our relationship with you all in the future.

swinburne-university-of-technology-squarelogo
Associate Director Technical Services

Cameron Young

We have found them to be very professional and thorough right from start to finish.They did a great job capturing the project requirements and were very attentive to our requirements... the new TB workshop looks amazing.

Get in Touch

    Your Name required

    Your Email required

    Your Message