Quick contact info

Introducing a truly professional WordPress theme built to last! We developed Wilmër for all construction & architecture sites.

icon_widget_image Monday-Friday: 9am to 5pm; Satuday: 10ap to 2pm icon_widget_image 7300-7398 Colonial Rd, Brooklyn, NY 11209, USA icon_widget_image + (123) 1234-567-8900 + (123) 1234-567-8901 icon_widget_image [email protected] [email protected]

Projects

Projects
Infrastructure

Melbourne PV System

Project Highlights
  • Coordinate with available existing electrical infrastructure;
  • How the renewable power could be utilised by the facility;
  • How the power produced would be reticulated around the site;
  • Considerations to future development of the site;
  • Protection requirements as required by local power utilities.

AREA3 were requested by a client to investigate and develop a business case and proposal to install 400kW of solar arrays at the location of one of their Data Centres.

As part of the detailed investigation, AREA3 assessed a range of possible options for the installation of the solar arrays, including:

  • Roof mounted solar arrays spread across a number of buildings;
  • Solar arrays installed on available open ground set aside for future development;
  • Solar car park shades to existing car parking areas.

The business case looks at how the onsite production of renewable energy could provide a positive return and help achieve environmental initiatives in the wider organisation. The report and feasibility of the system also considered the complex calculation and forecasting of power supply charges for the client, which is a high voltage (HV) power supplied customer.

The proposal increases the amount of renewable onsite production of energy by 8 times the levels previously identified by the masterplan for the site in the short term and demonstrates the potential for future solar power production on the site.

Our Clients

Testimonials

Regional Project Director

David Guth

Following the highly successful launch of Stage 1 of Global Switch Sydney East, we chose to extend our relationship with AREA3 from Stage 1 into Stages 2 and 3 due to their professionalism, knowledge of mission-critical infrastructure projects, and the high quality of their work

Critical Services Manager

Barry Robertson

Your diligence throughout the project concept, design and construction is what helped the actual install go as smoothly as it did. You have all been a fantastic team to work with and we look forward to continuing our relationship with you all in the future.

swinburne-university-of-technology-squarelogo
Associate Director Technical Services

Cameron Young

We have found them to be very professional and thorough right from start to finish.They did a great job capturing the project requirements and were very attentive to our requirements... the new TB workshop looks amazing.

Get in Touch

    Your Name required

    Your Email required

    Your Message