Quick contact info

Introducing a truly professional WordPress theme built to last! We developed Wilmër for all construction & architecture sites.

icon_widget_image Monday-Friday: 9am to 5pm; Satuday: 10ap to 2pm icon_widget_image 7300-7398 Colonial Rd, Brooklyn, NY 11209, USA icon_widget_image + (123) 1234-567-8900 + (123) 1234-567-8901 icon_widget_image wilmer@mikadothemes.com wilmer2@mikadothemes.com

Projects

Projects
Education

Melbourne University, Melbourne

Project Highlights
  • Working with the prestigious and dynamic Melbourne University.
  • Envisioning a project with a focus on the future, predicting growth.
  • Coordinating the roll out of a pilot program to test the project’s viability.
  • Collaborating with a variety of disciplinary professionals to design the best solution.
  • Supporting the university with undertaking the huge $450m project.

In 2016 the University of Melbourne commissioned a multidisciplinary design team to construct accommodation that will cater for the rapid growth predicted between then and 2020.

The objectives of the Accommodation Strategy are to map out future infrastructure capacity, using the School of Engineering ‘Spaces for 2025’ report as a guide.

AREA3 has been providing project management services to support the Melbourne University School of Engineering in delivering this prestigious $450 million program.

The delivery of the initial pilot program, is currently being rolled out across Parkville, Carlton Connect and a confidential New Campus. It includes the fit out of leased office space to be utilised as decanting accommodation, to support the smooth transition of staff and students across the university.

Our Clients

Testimonials

Regional Project Director

David Guth

Following the highly successful launch of Stage 1 of Global Switch Sydney East, we chose to extend our relationship with AREA3 from Stage 1 into Stages 2 and 3 due to their professionalism, knowledge of mission-critical infrastructure projects, and the high quality of their work

Critical Services Manager

Barry Robertson

Your diligence throughout the project concept, design and construction is what helped the actual install go as smoothly as it did. You have all been a fantastic team to work with and we look forward to continuing our relationship with you all in the future.

swinburne-university-of-technology-squarelogo
Associate Director Technical Services

Cameron Young

We have found them to be very professional and thorough right from start to finish.They did a great job capturing the project requirements and were very attentive to our requirements... the new TB workshop looks amazing.

Get in Touch

    Your Name required

    Your Email required

    Your Message