In conjunction with the hospital’s team, AREA3 staff selected and led the consultant team on an upgrade of St Vincent’s Hospital.
We then coordinated the preparation of the business case and board presentations. This included liaising with DHS, the management of working groups through design, tender, construction and delivery.
The infrastructure upgrade included improvements to an existing Co-Generation plant. They included electrical switching, and PLC re-configuration for load shedding.
Integration of fire alarms across the campus was also accomplished with the installation of Hospital Local Area Network via optic fibre.
Additional power generation (4MW) was installed to provide additional security to essential services.